/
Front End Release Process - Draft

Front End Release Process - Draft

Sample Release Number and Timelines

Release Number: 5.7.0

Development: 24th April - 17th May 2023

Code Freeze: 17th May

Current Process:

Assuming 3 features to be released in Player, then

Player

  • 5.7.0-beta.0 - 5.7.0-beta.1 - 5.7.0-beta.2 (3 tickets)

  • QA Regression

  • QA found Bug/Defects

  • Developer Fixes Defects/Bug

  • Developer publish 5.7.0-beta.3 - QA test the same

  • QA SignOff

  • 5.7.0

  • Merge release branch to main

New Process:

Player

  • 5.7.0 - 5.7.1 - 5.7.2

  • QA Regression

  • Bug/Defect

  • Developer Fixes Defects/Bug

  • Developer publish 5.7.3 - 5.7.4 - QA test the same

  • QA SignOff

  • Merge release branch to main

 

Add label

Related content

Client integration with V2 API | Backward compatibility
Client integration with V2 API | Backward compatibility
Read with this
Quality Assurance: Release Process & Strategy
Quality Assurance: Release Process & Strategy
More like this
Engage Community - DRAFT
Engage Community - DRAFT
Read with this
Sprint Planning
Sprint Planning
More like this
Proposed QuML Spec Changes
Proposed QuML Spec Changes
Read with this
Release 4.5.0.0
Release 4.5.0.0
More like this